
***Completed /2023***
| Lenght | 59,85m |
|---|---|
| Beam | 14,95m |
| Draft | 4,75m |
| DWT | 500 Ton |
| Class | RINA |
| Nation | FIFI1 system to be upgrade to FIFI2 (Including design drawings and RINA class approving) ORO Tank to coverted Sewage Tank and sewage line to revised |

***Completed /2023***
| Lenght | 59,85m |
|---|---|
| Beam | 14,95m |
| Draft | 4,75m |
| DWT | 500 Ton |
| Class | RINA |
| Nation | FIFI1 system to be upgrade to FIFI2 (Including design drawings and RINA class approving) ORO Tank to coverted Sewage Tank and sewage line to revised |